Búsqueda rápida:
 

Fire Resistant Deck Flooring

Haga clic en la imagen para ver la obra de arte
precio unitario: negotiable
Min cantidad:
cantidad:
Plazo de entrega: Consignment Deadline Days
Zona: Beijing
Fecha de caducidad : Long Effective
última actualización: 2022-04-09 07:18
conteo de visitas: 477
enquiry
Perfil de la compañía
 
 
Detalles del producto

Building Materials Galvanized Corrugated Metal Steel Floor Decking Sheet Prices

Floor deck is widely used in power plant, power equipment company, steel structure workshop, large supermarket, logistics center and other steel structure buildings. The main features of the floor deck can meet the requirements of the rapid construction of the main steel structure, it also can provide a strong platform in a short time.


Name: Floor Decking Sheet

Model:YX51-200-600,YX51-200-800,YX51-190-760,YX70-200-700

Thickness: 0.8-2mm(normal use)

Material:Galvanized

Coating:100-275/m2

Bundle Weight;2-5MT

Width: Customized

Length:Customized

Application:Steel Structure House


Advantage of steel Floor decking sheet:

1. Save a lot of temporary modules and modules support

2. Reduce the use of concrete and permanent weight of the structure,which is of great significance to high rise building when in face of earthquake

3. Save a lot of labour in transportation,storage and installation

4. It is convenient to install cable of communication and electricity.The floor decking can also be installed with thermal and sound insulation material to improve the properly of the floor

5. This floor decking can give full play to the tensile strength and ductility of steel and the compressive strength and stiffness of concrete.The combination of steel and concrete improves the entire bucking and partial bucking of steel

6. As a tensile steel,this floor decking can reduce the rebar quantity and installation

7. This floor decking can serve as the platform,realizing three dimensional work and speeding up installation time.

In order to prevent the slippage between the floor deck and the reinforced concrete, studs are needed in both ends of floor deck, the studs should be placed on the end base of deck sheet and go through the concave part of the board to be eventually welded together with the edge of the steel girder.


FAQ

Q1. Are you a factory or a trading company?

We are professional factory with ISO,CE standard,OEM service is welcome.


Q2. What's your delivery time?

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 5-15 days after receive deposit. Large order delivery time should be arranged separately.


Q3. How to control the quality of your product?

a) Quality of the design: think about possible problems in advance and provide a high quality design solution.

b) Quality of the raw material: choose the qualified raw material

c) Quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.


http://es.sdhengjiahaya.com/

Total 0 Bar [Ver todos]  Comentarios relacionados
 
Más>otros productos

[ Products Buscar ]  [ Enviar Fav ]  [ Compartir ]  [ Impresión ]  [ Enviar informe ]  [ Cerca ]

 
Casa | Products | Suppliers | News | Mapa del sitio | Mensaje | RSS Feed